General Information
Completion: | 11 June 2008 |
---|---|
Duration of works: | 19 months |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Deck arch bridge Two-hinged arch bridge |
Material: |
Reinforced concrete bridge |
Location
Location: |
Gignac, Hérault (34), Occitanie, France |
---|---|
Crosses: |
|
Part of: | |
Near: |
Gignac Bridge (1810)
|
Coordinates: | 43° 39' 7" N 3° 32' 5" E |
Technical Information
Dimensions
length | 130 m | |
arch span | 70 m | |
deck | deck width | 24 m |
number of lanes | 2 x 2 |
Cost
construction cost (without tax) | Euro 7 600 000 |
Participants
Owner
Client
Design
Architecture
-
Architecture et Ouvrages d'art
- Charles Lavigne (architect)
Structural engineering
Consulting
- Michel Virlogeux (consultant)
Checking engineering
Contractor
Subcontractor
Deep foundations
Prestressing
Concrete supplier
Reinforcing steel
Formwork & shoring
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- L'750 s'apprête à franchir l'Hérault. In: Le Moniteur des Travaux Publics et du Bâtiment, n. 5447 (18 April 2008), pp. 48.
- L'arc sous toutes ses formes. In: Le Moniteur des Travaux Publics et du Bâtiment, n. 5392 (30 March 2007), pp. 64-70. (2007):
- Un arc tendu sur l'Hérault. In: Construction moderne ( 2008), pp. 1-4. (2008):
- Le deuxième pont de Gignac (Hérault). Fondation sur micropieux de l'appui rive gauche. In: Travaux, n. 844 (September 2007), pp. 87-92. (2007):
- Gignac. Un arc en béton au-dessus de l'Hérault. In: Chantiers de France, n. 403 (September 2007). (2007):
- About this
data sheet - Structure-ID
20011782 - Published on:
15/04/2004 - Last updated on:
05/02/2016