0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1986
Completion: 1987
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Rhone River
Coordinates: 46° 13' 2.26" N    7° 21' 5.92" E
Show coordinates on a map

Technical Information

Dimensions

rise 14 m
arch span 78 m

Cost

cost of construction Swiss Franc 2 260 000

Materials

deck reinforced concrete
arches steel
abutments reinforced concrete

Participants

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20006466
  • Published on:
    20/10/2002
  • Last updated on:
    23/08/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine