General Information
Completion: | 1 July 1994 |
---|---|
Duration of works: | 12 months |
Status: | in use |
Project Type
Structure: |
Haunched girder bridge |
---|---|
Function / usage: |
Road bridge |
Structure: |
Twin girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Structure: |
Two-span continuous girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Saumur, Maine-et-Loire (49), Pays de la Loire, France |
---|---|
Coordinates: | 47° 15' 46.70" N 0° 5' 43.19" W |
Technical Information
Dimensions
length | 152 m | |
span lengths | 2 x 76 m | |
number of spans | 2 | |
deck | width | 13.54 m |
girder depth | 1.70 - 3.50 m |
Quantities
deck | structural steel | 590 t |
concrete volume | 625 m³ | |
reinforcing steel | 110 t |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
cross beams |
steel
|
girders |
steel
|
Participants
Owner
Client
Design
Architecture
-
Alain Spielmann Architecte
- Alain Spielmann (architect)
Civil works
Steel construction
Stone cutting
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Pont de l'Ecluse à Saumur. In: Bulletin ponts métalliques, n. 18 ( 1996), pp. 91-99. (1996):
- About this
data sheet - Structure-ID
20010878 - Published on:
05/12/2003 - Last updated on:
06/01/2017