General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Paris (12th), Paris, Ile-de-France, France Paris (13th), Paris, Ile-de-France, France |
---|---|
Crosses: |
|
Part of: | |
Coordinates: | 48° 49' 35" N 2° 23' 20" E |
Technical Information
Dimensions
total length | 270 m | |
span lengths | 58.50 m - 90 m - 65 m - 56.50 m | |
number of spans | 4 | |
deck | deck width | 42 m |
Materials
substructure |
reinforced concrete
|
---|---|
deck |
precast prestressed concrete
|
Participants
Engineering
- A. Long-Depaquit (engineer)
- Rousselin (engineer)
- J.-L. Dambre (engineer)
- Herzog (engineer)
Contractor
Relevant Web Sites
Relevant Publications
- Le franchissement de la Seine par le boulevard périphérique à l'Est de Paris. Construction du pont Amont. In: Travaux, n. 458 (May 1973), pp. 139. (1973):
- Les Ponts de Paris. 1st edition, Action artisique de la ville de Paris, Paris (France), pp. 231. (1999):
- About this
data sheet - Structure-ID
20000527 - Published on:
20/11/1999 - Last updated on:
05/02/2016