General Information
Completion: | 2020 |
---|---|
Status: | under construction |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Lattice truss bridge |
Location
Location: |
Bordeaux, Gironde (33), Nouvelle-Aquitaine, France |
---|---|
Coordinates: | 44° 49' 15.52" N 0° 33' 26.27" W |
Technical Information
Dimensions
main bridge | ||
---|---|---|
total length | 196 m | |
ramp Amédée | ||
total length | 195 m | |
ramp Armagnac | ||
total length | 185 m | |
viaduct | ||
total length | 150 m |
Materials
truss |
steel
|
---|
Participants
Design
-
Marc Mimram Ingénierie
- Marc Mimram (designer)
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20072949 - Published on:
02/05/2017 - Last updated on:
22/02/2019