General Information
Name in local language: | Pont de Pont-à-Mousson |
---|---|
Completion: | 1984 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Pont-à-Mousson, Meurthe-et-Moselle (54), Grand-Est, France |
---|---|
Crosses: |
|
Coordinates: | 48° 55' 3.68" N 6° 2' 36.36" E |
Technical Information
Dimensions
total length | 415 m | |
span lengths | 42 m - 55 m - 62 m - 2 x 76 m - 62 m - 42 m | |
number of spans | 7 | |
deck | deck depth | 2.75 - 4.50 m |
deck width | 11 m | |
web thickness | 0.45 m |
Quantities
deck | concrete volume | 3 437 m³ |
reinforcing steel | 466 t | |
internal prestressing | 71.6 t | |
external prestressing | 63 t |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Owner
Client
Structural engineering
Checking engineering
Co-contractor
Foundations
Prestressing
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Construction du deuxième pont sur la Moselle à Pont-à-Mousson. In: Travaux, n. 595 (January 1985), pp. 22-35. (1985):
- De nouveaux câbles de précontrainte pour le viaduc. In: Le Moniteur des Travaux Publics et du Bâtiment, n. 5369 (20 October 2006), pp. 47.
- Deuxième pont sur la Moselle à Pont-à-Mousson. In: Bulletin annuel AFPC ( 1983- 1984), pp. 327-332.
- Pont de Pont-à-Mousson (Meurthe-et-Moselle). In: Travaux, n. 606 (January 1986), pp. 74.
- Viaduc de Pont-à-Mousson. Suivi par courburemétrie lors des travaux de remplacement de précontrainte extérieure. In: Ouvrages d'art, n. 56 (November 2007). (2007):
- About this
data sheet - Structure-ID
20013823 - Published on:
16/10/2004 - Last updated on:
12/08/2022