General Information
Completion: | 2019 |
---|---|
Status: | under construction |
Project Type
Structure: |
Haunched girder bridge Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Construction method: |
Balanced cantilever method |
Location
Location: |
Kičevo, North Macedonia |
---|---|
Coordinates: | 41° 28' 50.65" N 20° 52' 16.82" E |
Technical Information
Dimensions
main span | 165 m | |
deck depth | 4.00 - 9.00 m | |
total length | 381 m |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Case Studies and Applied Products
Longest balanced cantilever bridge in Northern Macedonia
Upon completion, a new, almost 65 km long motorway will connect the cities of Kičevo and Ohrid in the south west of the North Macedonian Republic. On the first section between Kičevo and Podvis, it was necessary to build a 381 m long via ... [more]