General Information
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
High-speed rail tunnel |
Construction method: |
ADECO-RS (Lunardi Method) |
Location
Location: |
Bologna, Bologna, Emilia-Romagna, Italy |
---|---|
Part of: | |
Coordinates: | 44° 27' 4" N 11° 22' 17" E |
Technical Information
Dimensions
tunnel length | 10 711 m | |
number of tracks | 2 | |
tunnel section area | 150 m² |
Quantities
concrete volume | 485 000 m³ | |
shotcrete | 280 000 m³ |
Chronology
15 June 2005 | Breakthrough at km 7.372 |
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Breakthrough per la galleria Pianoro. In: Strade e Autostrade, v. 9, n. 53 (September 2005), pp. 132-133. (2005):
- About this
data sheet - Structure-ID
20004827 - Published on:
05/09/2002 - Last updated on:
28/05/2021