General Information
Completion: | 2011 |
---|---|
Status: | in use |
Project Type
Structure: |
Half-through arch bridge |
---|---|
Function / usage: |
Bicycle and pedestrian bridge |
Material: |
Steel bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Dortmund, North Rhine-Westphalia, Germany |
---|---|
See also: |
Hörder Hafenstrasse Footbridge (2011)
PHOENIX Lake Footbridge (North) (2011) |
Coordinates: | 51° 29' 11.77" N 7° 31' 25.83" E |
Technical Information
Dimensions
total length | 41 m | |
span | 29 m | |
number of spans | 1 | |
abutments | number | 2 |
arches | rise | 2.40 m |
deck | deck slab thickness | 0.20 m |
walkway width | 5.00 m |
Cost
cost of construction | ca. Euro 530 000 | |
cost of construction per m² | ca. Euro 2 600 |
Materials
arches |
steel
|
---|---|
suspenders |
steel
|
deck slab |
reinforced concrete
|
cross beams |
steel
|
Participants
Owner
Design
Structural engineering
Lighting design
Relevant Web Sites
Relevant Publications
- Simple Bridges. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):
- Simple Bridges. In: Steel Construction, v. 9, n. 1 (February 2016), pp. 67-73. (2016):
- About this
data sheet - Structure-ID
20071896 - Published on:
18/10/2016 - Last updated on:
15/08/2024