0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Pfändertunnel
Beginning of works: 1977
Completion: 10 December 1980
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , ,
Next to: Pfänder Tunnel (2012)
Coordinates: 47° 32' 22" N    9° 45' 25" E
Coordinates: 47° 29' 17" N    9° 44' 46" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 6 718.00 m
tunnel section area 81.70 - 94.20 m²

Cost

cost of construction Austrian Shilling 1 400 000 000

Participants

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20007181
  • Published on:
    09/12/2002
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine