General Information
Name in local language: | Pfändertunnel |
---|---|
Beginning of works: | 1977 |
Completion: | 10 December 1980 |
Status: | in use |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Location
Location: |
Bregenz, Vorarlberg, Austria |
---|---|
Next to: |
Pfänder Tunnel (2012)
|
Coordinates: | 47° 32' 22" N 9° 45' 25" E |
Coordinates: | 47° 29' 17" N 9° 44' 46" E |
Technical Information
Dimensions
tunnel length | 6 718.00 m | |
tunnel section area | 81.70 - 94.20 m² |
Cost
cost of construction | Austrian Shilling 1 400 000 000 |
Participants
Co-contractor
Relevant Web Sites
Relevant Publications
- Criteria for selecting a tunnelling method using the first and the second tube of the Pfänder tunnel as example / Kriterien zur Wahl der Vortriebsmethode am Beispiel Pfändertunnel erste und zweite Röhre. In: Geomechanics and Tunnelling, v. 4, n. 5 ( 2011), pp. 527-533. (2011):
- About this
data sheet - Structure-ID
20007181 - Published on:
09/12/2002 - Last updated on:
28/05/2021