General Information
Name in local language: | Pfändertunnel |
---|---|
Beginning of works: | November 2007 |
Completion: | 26 June 2012 |
Status: | in use |
Project Type
Function / usage: |
Road tunnel |
---|---|
Construction method: |
Shielded tunnel boring machine (TBM-S) |
Structure: |
Tunnel |
Location
Location: |
Bregenz, Vorarlberg, Austria |
---|---|
Next to: |
Pfänder Tunnel (1980)
|
For: |
A 14 Motorway (Austria)
|
Coordinates: | 47° 32' 21.12" N 9° 45' 24.17" E |
Coordinates: | 47° 29' 17.28" N 9° 44' 44.95" E |
Technical Information
Dimensions
tunnel length | 6.5 km |
Participants
Operator
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Construction of the second bore of the Pfaender tunnel / Bau der zweiten Röhre des Pfändertunnels. In: Geomechanics and Tunnelling, v. 2, n. 5 ( 2009), pp. 502-512. (2009):
- Criteria for selecting a tunnelling method using the first and the second tube of the Pfänder tunnel as example / Kriterien zur Wahl der Vortriebsmethode am Beispiel Pfändertunnel erste und zweite Röhre. In: Geomechanics and Tunnelling, v. 4, n. 5 ( 2011), pp. 527-533. (2011):
- About this
data sheet - Structure-ID
20059168 - Published on:
13/12/2010 - Last updated on:
28/01/2020