General Information
Name in local language: | Pont del Petroli |
---|---|
Completion: | 2009 |
Status: | in use |
Project Type
Structure: |
Slab bridge |
---|---|
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Function / usage: |
original use: Pier current use: Pedestrian bridge (footbridge) |
Location
Technical Information
Dimensions
total length | 255 m | |
span lengths | 17 x 15 m | |
number of spans | 17 |
Materials
deck |
precast prestressed concrete
|
---|---|
piers |
steel tubes
|
pier heads |
reinforced concrete
|
Participants
Design
-
Enginyeria Reventós, SL
- Manuel Reventós i Rovira (designer)
Relevant Web Sites
Relevant Publications
- (2005): 21 footbridges in 21 years. Presented at: Footbridge 2005 (Second International Congress), Venezia, 06-08 December 2005.
- Works. Enginyeria Reventós.. Presented at: 4th International Conference Footbridge 2011, Wroclaw, Poland, 6-8 July 2011. (2011):
- About this
data sheet - Structure-ID
20072314 - Published on:
20/12/2016 - Last updated on:
09/06/2017