General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Box girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Support conditions: |
for registered users |
Structure: |
Haunched girder bridge Three-span continuous girder bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Fünfseen, Amt Malchow, Mecklenburgische Seenplatte, Mecklenburg-Western Pomerania, Germany |
---|---|
Coordinates: | 53° 27' 43.71" N 12° 22' 56.87" E |
Technical Information
Dimensions
total length | 264 m | |
span lengths | 64.75 m - 134.50 m - 64.74 m | |
number of spans | 3 | |
bridge surface | 8 342 m² | |
total width | 31,60 m | |
deck | deck depth | 3.88 - 6.18 m |
piles | diameter | 1.50 m |
Quantities
structural steel | 3 600 t | |
concrete volume | 12 000 m³ | |
reinforcing steel | 2 500 t | |
shear studs | 35 t | |
piles | total length of piles | 2 100 m |
Design Loads
live load | LM 1 (DIN EN 1991-2) | |
design code(s) | DIN EN 1991-2 |
Cost
cost of construction (incl. taxes) | ca. Euro 47 500 000 |
Materials
piers |
reinforced concrete
|
---|---|
girder |
steel
|
piles |
reinforced concrete
|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
Detailed design
Soil investigation report
Architectural consulting
Checking engineering
- Peter Otte (checking engineer)
Co-contractor
Steel construction
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2021. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2021, pp. 25-38.
- Chronik des Brückenbaus. Presented at: 30. Dresdner Brückenbausymposium, 8./9. März 2021, Dresden (Germany), pp. 100. (2021):
- About this
data sheet - Structure-ID
20083114 - Published on:
11/06/2022 - Last updated on:
20/08/2022