General Information
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
High-speed rail tunnel |
Location
Location: |
Figueres, Girona, Catalonia, Spain Montesquieu-des-Albères, Pyrénées-Orientales (66), Occitanie, France |
---|---|
Part of: | |
Coordinates: | 42° 31' 16.83" N 2° 51' 33.01" E |
Coordinates: | 42° 26' 47.02" N 2° 51' 42.82" E |
Technical Information
Dimensions
tunnel length | 8 171 m |
Cost
cost of construction | Euro 301 000 000 |
Chronology
19 December 2010 | Opened to traffic. |
---|
Participants
Architecture
- Architecture NEEL
- Fabrice Néel (architect)
Civil works
Track works
Catenaries, signals, etc.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Beton für die Feste-Fahrbahn im Tunnelabschnitt der Hochgeschwindigkeitsstrecke zwischen Perpignan und Figueras. In: Beton- und Stahlbetonbau, v. 104, n. 12 (December 2009), pp. 860-863. (2009):
- Des travaux sous les Pyrénées à mener tambour battant. In: Le Moniteur des Travaux Publics et du Bâtiment, n. 5355 (14 July 2006), pp. 44-45. (2006):
- LGV Perpignan-Figueras: 8 km de tunnel sous les Pyrénées. In: Le Moniteur des Travaux Publics et du Bâtiment, n. 5405 (29 June 2007), pp. 62-63. (2007):
- Ligne ferroviaire à grande vitesse Perpignan-Figueras. Les tunneliers du tunnel du Perthus. In: Travaux, n. 822 (September 2005), pp. 70-72. (2005):
- Le projet de tunnel du Perthus. Presented at: AFTES - Journées d'études, Chambéry, 1996, pp. 181-184. (1996):
- About this
data sheet - Structure-ID
20009055 - Published on:
18/04/2003 - Last updated on:
28/05/2021