0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Passerelle du parc de la Rivière-aux-Sables

General Information

Beginning of works: 22 May 1998
Completion: 1998
Status: in use

Project Type

Awards and Distinctions

Location

Location: , , , ,
Coordinates: 48° 24' 23.36" N    71° 15' 51" W
Show coordinates on a map

Technical Information

Dimensions

total length 80 m
deck width 6 m
deck slab thickness 150 mm

Cost

cost of construction Canadian dollar 1 800 000

Materials

deck aluminum
foundations reinforced concrete
pylons precast concrete
piles steel
deck slab precast prestressed concrete
stay cables prestressing steel
railing aluminum

Chronology

22 May 1998

Construction begins.

August 1998

Rock anchorages.

October 1998

Erection of the pylons and the main structure.

November 1998

Installation of the deck and finishings.

Participants

Current owner
Owner
Design

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20012142
  • Published on:
    21/05/2004
  • Last updated on:
    04/02/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine