0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 29 May 1998
Status: in use

Project Type

Structure: Through truss bridge
Subdivided Warren truss bridge
Function / usage: lower deck:
Railroad (railway) bridge
upper deck:
Road bridge
Material: Steel bridge
Construction method: Longitudinal launching

Location

Location: ,
,
Coordinates: 20° 5' 51.37" S    51° 1' 25.31" W
Coordinates: 20° 6' 50.44" S    50° 59' 31.82" W
Show coordinates on a map

Technical Information

Dimensions

total length 3 770 m
approach viaduct 1
total length 720 m
approach viaduct 2
total length 450 m
main bridge
total length 2 600 m
span lengths 26 x 100 m
number of spans 26

Quantities

concrete volume 64 000 m³

Materials

truss steel
deck of approach viaducts concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20004959
  • Published on:
    15/09/2002
  • Last updated on:
    02/01/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine