General Information
Other name(s): | Paradiesbrücke Zwickau |
---|---|
Completion: | 1900 |
Status: | in use |
Project Type
Structure: |
Pony truss bridge Continuous truss bridge Subdivided Warren truss bridge |
---|---|
Material: |
Steel bridge |
Function / usage: |
original use: Road bridge current use: Bicycle and pedestrian bridge |
Location
Location: |
Zwickau, Zwickau (Kreis), Saxony, Germany |
---|---|
Crosses: |
|
Coordinates: | 50° 43' 3.43" N 12° 30' 6.48" E |
Technical Information
Dimensions
width | 12.00 m | |
total length | 69.00 m | |
span lengths | 2 x 27 m | |
number of spans | 2 |
Materials
truss |
steel
|
---|
Participants
Initial construction (1900)
Steel construction
Rehabilitation (2002)
Structural engineering
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20023175 - Published on:
30/09/2006 - Last updated on:
05/02/2016