General Information
Status: | in use |
---|
Project Type
Structure: |
Girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge |
Location
Location: |
Pakistan |
---|---|
Part of: |
Technical Information
Materials
deck |
prestressed concrete
|
---|
Participants
Structural engineering
Construction
General contractor
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20009006 - Published on:
15/04/2003 - Last updated on:
30/12/2019