General Information
Completion: | 2012 |
---|---|
Status: | in use |
Project Type
Structure: |
Double T-section girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Rennaz, Vaud, Switzerland |
---|---|
Crosses: |
A 9 Motorway (Switzerland) (1970)
|
Coordinates: | 46° 22' 12" N 6° 55' 23" E |
Technical Information
Dimensions
main span | 34.80 m | |
total length | 351.60 m | |
span lengths | 26.40 m - 33.00 m - 34.80 m - 7 x 33.00 m - 26.40 m | |
number of spans | 11 | |
deck | deck width | 11.50 m |
number of longitudinal girders | 2 |
Cost
cost of construction | Swiss Franc 12 500 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Architecture
Structural engineering
Geotechnical/geological experts
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2015): ArtStructures, From competition to completion using the synthetic design method. Presented at: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, pp. 484-493.
- (2016): Innovation: Key to Structures of Tomorrow. Presented at: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, pp. 2251-2258.
- About this
data sheet - Structure-ID
20064605 - Published on:
19/02/2013 - Last updated on:
05/02/2016