General Information
Completion: | 2005 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Box girder bridge |
Construction method: |
Precast segmental construction |
Material: |
Prestressed concrete bridge Fiber-reinforced concrete bridge |
Location
Location: |
Saint-Paul-lès-Monestier, Isère (38), Auvergne-Rhône-Alpes, France |
---|---|
Crosses: |
|
Part of: | |
Coordinates: | 44° 55' 18.31" N 5° 37' 47.82" E |
Technical Information
Dimensions
span | 47.40 m | |
deck | width | 4.40 m |
deck slab thickness | 14 cm | |
girder depth | 1.60 m |
Materials
girders |
prestressed BCV® high-strength fiber-reinforced concrete
|
---|
Participants
Owner
Design
Structural engineering
Checking engineering
Contractor
Cement supplier
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Construction de deux ponts routiers en béton fibré ultra performant (BFUP). In: Ouvrages d'art, n. 53 (November 2006), pp. 2-11. (2006):
- About this
data sheet - Structure-ID
20025830 - Published on:
06/01/2007 - Last updated on:
04/02/2019