0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 19 June 1928
Status: in use

Project Type

Location

Location: , , ,
, , ,
Crosses:
  • Arthur Kill
Coordinates: 40° 31' 29" N    74° 14' 48" W
Show coordinates on a map

Technical Information

Dimensions

main span 226.6 m
total length 2 682.2 m
clearance 41.1 m
number of lanes 4
main bridge
length 640.1 m

Materials

piers reinforced concrete
truss steel

Excerpt from Wikipedia

The Outerbridge Crossing, also known as the Outerbridge, is a cantilever bridge that spans the Arthur Kill between Perth Amboy, New Jersey, and Staten Island, New York. It carries New York State Route 440 (NY 440) and New Jersey Route 440, with the two roads connecting at the state border near the bridge's center. The Outerbridge Crossing is one of three vehicular bridges connecting New Jersey with Staten Island, and like the others, is maintained and operated by the Port Authority of New York and New Jersey. The others are the Bayonne Bridge (also carrying Route 440), which connects Staten Island with Bayonne, and the Goethals Bridge (carrying Interstate 278 (I-278), which connects the island with Elizabeth).

Description

The bridge was named for Eugenius Harvey Outerbridge, the first chairman of the then–Port of New York Authority and a resident of Staten Island. Rather than calling it the "Outerbridge Bridge", the span was labeled a "crossing", but many New Yorkers and others mistakenly assume the name comes from the fact that it is the most remote bridge in New York City and the southernmost crossing in New York state.

The bridge is of a steel cantilever construction, designed by John Alexander Low Waddell and built under the auspices of the Port of New York Authority, now the Port Authority of New York and New Jersey, which currently operates it. It opened simultaneously with the first Goethals Bridge on June 29, 1928. Both spans had similar designs prior to replacement of the Goethals with the current cable-stayed bridge in 2018. Neither bridge saw high traffic counts until the opening of the Verrazzano-Narrows Bridge in 1964. Traffic counts on both bridges were also depressed due to the effects of the Great Depression and World War II.

The Outerbridge Crossing has undergone numerous repairs as a result of the high volume of traffic that crosses the bridge each day. On October 11, 2013, the Port Authority announced the completion of the bridge's repaving project.

On March 2, 2017, Port Authority Executive Director Patrick Foye announced the funding of a study into a potential replacement bridge.

Traffic

The Outerbridge Crossing carried 32,438,000 vehicles (both directions) in 2006, or approximately 90,000 each day. Tolls are collected in the eastbound direction only.

In 2003, the Port Authority raised the speed limit for the three inner E-ZPass lanes at the toll plaza from 15 to 25 miles per hour (25 to 40 km/h), separating these lanes from the rest of the eight-lane toll plaza by a barrier. Two years later, the tollbooths adjacent to the 25 mph E-ZPass lanes were removed and overhead gantries were installed with electronic tag readers to permit E-ZPass vehicles to travel at 45 miles per hour (70 km/h) in special high-speed lanes. Motorists using the high-speed E-ZPass lanes cannot use Exit 1 to Page Avenue, which is located immediately after the toll plaza.

Tolls

As of December 6, 2015, the cash toll going from New Jersey to New York is $15 for cars and motorcycles; there is no toll for passenger vehicles going from New York to New Jersey. E-ZPass users are charged $12.50 for cars or $11.50 for motorcycles during peak hours, and $10.50 for cars or $9.50 for motorcycles during off-peak hours.

Tolls are only collected for eastbound traffic. Originally, tolls were collected in both directions. In August 1970, the toll was abolished for westbound drivers, and at the same time, eastbound drivers saw their tolls doubled. The tolls of eleven other New York–New Jersey and Hudson River crossings along a 130-mile (210 km) stretch, from the Outerbridge Crossing in the south to the Rip Van Winkle Bridge in the north, were also changed to eastbound-only at that time.

Open road tolling began on April 24, 2019. The tollbooths were dismantled, and drivers are no longer able to pay cash at the bridge. Instead, there are cameras mounted onto new overhead gantries located on the Staten Island side. Drivers without E-ZPass have a picture of their license plate taken, and a bill for the toll is mailed to them. For E-ZPass users, sensors detect their transponders wirelessly.

In 2019, the Port Authority proposed raising cash tolls to $16. If approved by the Port Authority board, the toll increase will take place in early 2020.

Text imported from Wikipedia article "Outerbridge Crossing" and modified on July 22, 2019 according to the CC-BY-SA 4.0 International license.

Participants

Owner
Design
Design consultants
Consulting engineers

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001771
  • Published on:
    18/08/2001
  • Last updated on:
    17/04/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine