0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 2006
Status: in use

Project Type

Function / usage: High-speed rail tunnel
Construction method: Immersed tube method
Structure: Immersed tube tunnel

Location

Location: , ,
, ,
Underneath of:
  • Oude Maas
Part of:
Coordinates: 51° 48' 0.63" N    4° 35' 13.99" E
Coordinates: 51° 48' 48.15" N    4° 35' 13.41" E
Show coordinates on a map

Technical Information

Dimensions

total length 2 725 m
tunnel length 1 381 m
number of tracks 2

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20011843
  • Published on:
    19/04/2004
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine