0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Ortenaubrücke
Beginning of works: 2017
Completion: 12 April 2018
Status: in use

Project Type

Awards and Distinctions

2022 highly commended  
2020 entry  
recognition  
2019 entry  

Location

Location: , , ,
Coordinates: 48° 20' 3.58" N    7° 50' 26.15" E
Show coordinates on a map

Technical Information

Dimensions

main span 120 m
total length 290 m
walkway width 3.50 m
pylon height 50 m

Cost

cost of construction Euro 3 000 000

Materials

pylon steel
piers reinforced concrete
deck slab steel
access ramps reinforced concrete

Participants

Object planning
Design
Structural engineering

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20075506
  • Published on:
    19/07/2018
  • Last updated on:
    21/08/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine