General Information
Status: | in use |
---|
Project Type
Construction method: |
Balanced cantilever method |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge |
Structure: |
Haunched girder bridge Single-cell box girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Castro-Urdiales, Cantabria, Spain |
---|---|
Address: | A-8 |
Part of: | |
Coordinates: | 43° 21' 12.67" N 3° 10' 10.87" W |
Technical Information
Dimensions
span lengths | 72.00 m - 120.00 m - 72.00 m | |
number of spans | 3 | |
horizontal radius of curvature | 400 m | |
deck | deck depth | 2.40 - 6.00 m |
deck width | 2 x 12.60 m | |
web thickness | 0.40 m | |
piers | width | 7.50 m |
wall thickness | 0.35 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Tres puentes construidos por voladizos sucesivos. In: Hormigón y acero, v. 42, n. 180 (3rd Quarter 1991), pp. 75-80. (1991):
- About this
data sheet - Structure-ID
20076311 - Published on:
04/11/2018 - Last updated on:
04/11/2018