0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 30 March 1892
Status: out of service

Project Type

Structure: Deck truss bridge
Plan view: Structurae Plus/Pro - Subscribe Now!
Material: Steel bridge
Structure: Cantilever truss bridge
Support conditions:
Secondary structure(s): Structurae Plus/Pro - Subscribe Now!
Material: Structurae Plus/Pro - Subscribe Now!
Function / usage: original use:
Railroad (railway) bridge
original use:
Road bridge
current use:
Pedestrian bridge (footbridge)

Location

Location: , ,
Crosses:
  • Gourits River
Replaced by: Gourits River Bridge (N2) (1978)
Coordinates: 34° 11' 7.70" S    21° 45' 10.81" E
Show coordinates on a map

Technical Information

Materials

piers steel
truss steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20085739
  • Published on:
    18/04/2023
  • Last updated on:
    18/04/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine