General Information
Official designation: | Bauwerk Lau 1 |
---|---|
Beginning of works: | September 2009 |
Completion: | December 2012 |
Status: | in use |
Project Type
Structure: |
Deck arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel-reinforced concrete composite bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Bad Lauterberg im Harz, Osterode am Harz (Kreis), Lower Saxony, Germany |
---|---|
Address: | B 243n |
Coordinates: | 51° 37' 19.58" N 10° 25' 55.62" E |
Technical Information
Dimensions
main span | 103 m | |
total length | 496.00 m | |
span lengths | 35.00 m - 47.00 m - 46.50 m - 2 x 45.00 m - 47.00 m - 50.00 m - 77.50 m - 103.00 m | |
deck width | 20.56 m | |
number of spans | 9 | |
bridge surface | 10 198 m² | |
deck | roadway / carriageway width | 7.50 m + 8.00 m |
Quantities
structural steel | 3 364 t | |
deck | concrete volume | 4 668 m³ |
reinforcing steel | 1 023 t | |
substructure | concrete volume | 3 940 m² |
reinforcing steel | 500 t |
Design Loads
design code(s) | DIN FB 101 |
Materials
deck |
composite steel-reinforced concrete
|
---|---|
piers |
reinforced concrete
|
arches |
steel
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
-
Meyer + Schubart
- Ralf Schubart (designer)
Structural engineering
Checking engineering
- Wolfgang Wienecke (checking engineer)
Co-contractor
Resident engineering
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2015. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2015, pp. 45-64.
- About this
data sheet - Structure-ID
20059310 - Published on:
29/01/2011 - Last updated on:
05/02/2016