General Information
Name in local language: | Straßenüberführung Oberstaufen |
---|---|
Beginning of works: | March 2021 |
Completion: | December 2021 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Steel-reinforced concrete composite bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Structure: |
Three-span continuous girder bridge Multiple girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Oberstaufen, Oberallgäu, Bavaria, Germany |
---|---|
Coordinates: | 47° 32' 57.04" N 10° 1' 42.73" E |
Technical Information
Dimensions
total length | 57.96 m | |
span lengths | 17.71 m - 22.495 m - 17.755 m | |
deck width | 12.31 m | |
bridge surface | 714 m² | |
number of lanes | 2 | |
total width | 12.81 m | |
roadway / carriageway width | 8.71 m | |
abutments | number | 2 |
deck | deck depth | 1.37 m |
on-center distance between girders | 2.02 m | |
girder depth | 1.00 m | |
number of longitudinal girders | 6 | |
piers | number | 2 |
Quantities
deck | structural steel | 120 t |
concrete volume | 430 m³ | |
reinforcing steel | 91 t | |
substructure | concrete volume | 410 m³ |
reinforcing steel | 70 t |
Design Loads
live load | LM 1 | |
design code(s) | DIN EN 1991-2 + NA |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
(C 35/45)
|
abutments |
reinforced concrete
|
cross beams |
weathering steel
(S 355 J2 W)
|
girders |
weathering steel
(S 355 J2 W)
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2023. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2023, pp. 69-82.
- About this
data sheet - Structure-ID
20088614 - Published on:
31/05/2024 - Last updated on:
31/05/2024