0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 7 March 2022
Completion: 24 June 2022
Status: in use

Project Type

Location

Location: , ,
Location description: The bridge crosses the Gahanga river.
Coordinates: 1° 53' 19.19" S    30° 1' 58.69" E
Show coordinates on a map

Technical Information

Materials

cables steel wire
deck steel
anchorages reinforced concrete

Notes

The bridge built by Bridges to Prosperity serves around 2972 people in the communities of Karenge - Bugarama.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20084823
  • Published on:
    27/01/2023
  • Last updated on:
    27/01/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine