General Information
Completion: | 2005 |
---|---|
Duration of works: | 3 months |
Status: | in use |
Project Type
Function / usage: |
Pedestrian bridge (footbridge) |
---|---|
Structure: |
Single-span two-tower suspension bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Steel bridge Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Nyagisenyi, South Province, Rwanda |
---|---|
Previously: |
Mbirurume River Bridge (2002)
|
Technical Information
Dimensions
width | 0.8 m | |
span | 38 m |
Cost
cost of construction | Euro 8 200 |
Materials
cables |
steel wire
|
---|---|
pylons |
steel
|
deck flooring |
wood
|
Participants
Design
Construction engineers
-
Ingenieure ohne Grenzen e.V. Brückenbau
- Florian Winkler (construction supervisor)
- Dominik Metzler (construction supervisor)
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20019191 - Published on:
24/01/2006 - Last updated on:
05/02/2016