0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2002
Completion: 2002
Status: dismantled

Project Type

Location

Location: ,
Crossed:
  • Mbirurume
Rebuilt as: Nyagisenyi Footbridge (2005)

Technical Information

Cost

cost of construction German Mark 25 000

Materials

cables steel wire
pylons steel

Participants

Engineering
Construction supervision

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20014277
  • Published on:
    06/11/2004
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine