0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

North-South Corridor Cross Harbour Tunnels

General Information

Beginning of works: 2015
Completion: 2020
Status: under construction

Project Type

Construction method: Immersed tube method
Structure: Immersed tube tunnel
Function / usage: Metro tunnel / subway tunnel
Construction method: Cut-and-cover method

Location

Location: , ,
, ,
Part of:
Coordinates: 22° 18' 0.20" N    114° 10' 52.89" E
Coordinates: 22° 17' 2.16" N    114° 11' 4.40" E
Show coordinates on a map

Technical Information

Dimensions

total length 1 700 m
number of tracks 2 x 1
number of tubes 2
tunnel unit length ca. 160 m

Cost

cost of construction Hong Kong dollar 4 350 000 000

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20070956
  • Published on:
    10/03/2016
  • Last updated on:
    10/03/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine