0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1905
Status: in use

Project Type

Structure: Arch bridge
Function / usage: Road bridge
Material: Reinforced concrete bridge

Location

Location: , , ,
Address: Kurrajong Road
Crosses:
  • Hawkesbury River
Coordinates: 33° 35' 5.78" S    150° 43' 27.13" E
Show coordinates on a map

Technical Information

Dimensions

total length 215 m
number of spans 13
standard span lengths 16.5 m

Materials

arches reinforced concrete

Chronology

ca. 1860

Timber structure at eastern end of Bell's Line of Road across the Blue Mountains.

1905

Present structure completed as relacement for above.

1926

Deck widened to add single-track railway westwards to Kurrajong.

1952

Railway removed: bridge thereafter road only.

Notes

With a total length of 215 metres, the bridge was the longest concrete structure in Australia for ten years after its completion.

Participants

Design
Contractor

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20029846
  • Published on:
    09/08/2007
  • Last updated on:
    26/06/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine