General Information
Completion: | December 2018 |
---|---|
Status: | in use |
Project Type
Structure: |
Rigid frame bridge |
---|---|
Material: |
Prestressed concrete bridge |
Function / usage: |
Road bridge |
Construction method: |
Precast concrete elements with in-situ joints |
Awards and Distinctions
2020 |
entry
for registered users |
---|
Location
Location: |
Werne, Unna (Kreis), North Rhine-Westphalia, Germany |
---|---|
Address: | Nordbecker Damm |
Coordinates: | 51° 42' 2.58" N 7° 40' 55.97" E |
Technical Information
Dimensions
width | 9.0 m | |
span | 27.5 m | |
superstructure | girder depth | min. 0.70 m |
Materials
piles |
reinforced concrete
|
---|---|
abutments |
precast reinforced concrete
|
girders |
precast prestressed concrete
|
Participants
Owner
Client
Design
Detailed design
Relevant Web Sites
Relevant Publications
- Zur Gestaltung von Fertigteilbrücken. In: Bautechnik, v. 96, n. 2 (February 2019), pp. 142-149. (2019):
- About this
data sheet - Structure-ID
20077168 - Published on:
04/04/2019 - Last updated on:
04/04/2019