0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 26 January 2012
Completion: 21 May 2015
Duration of works: 900 days
Status: in use

Project Type

Location

Location: ,
,
Crosses:
  • Euphrates River
Coordinates: 37° 53' 56.04" N    38° 58' 27.94" E
Show coordinates on a map

Technical Information

Dimensions

main span 400 m
width 24.50 m
total length 610 m
number of lanes 2 x 2
pylons height 96 m

Cost

cost of construction ca. 100 000 000

Materials

deck steel

Participants

Structural engineering
Contractor
Expansion joints

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20070573
  • Published on:
    25/01/2016
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine