General Information
Beginning of works: | 26 January 2012 |
---|---|
Completion: | 21 May 2015 |
Duration of works: | 900 days |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Cable-stayed bridge with semi-fan system Three-span cable-stayed bridge |
Material: |
Steel bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Adıyaman, Turkey Sanliurfa, Turkey |
---|---|
Crosses: |
|
Coordinates: | 37° 53' 56.04" N 38° 58' 27.94" E |
Technical Information
Dimensions
main span | 400 m | |
width | 24.50 m | |
total length | 610 m | |
number of lanes | 2 x 2 | |
pylons | height | 96 m |
Cost
cost of construction | ca. 100 000 000 |
Materials
deck |
steel
|
---|
Participants
Relevant Web Sites
Relevant Publications
- Structural performance of Nissibi cable-stayed bridge during the main and aftershocks of Adıyaman-Samsat earthquake on March 2, 2017. In: Asian Journal of Civil Engineering, v. 20, n. 3 (January 2019), pp. 443-464. (2019):
- About this
data sheet - Structure-ID
20070573 - Published on:
25/01/2016 - Last updated on:
05/02/2016