General Information
Completion: | September 2014 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Structure: |
Box girder bridge |
Material: |
Prestressed concrete bridge |
Construction method: |
Precast concrete elements with in-situ joints |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
main span: Swing bridge |
Material: |
main span: Steel bridge |
Location
Location: |
Brisbane, Queensland, Australia |
---|---|
Coordinates: | 27° 28' 15.10" S 153° 2' 26.67" E |
Coordinates: | 27° 27' 51.72" S 153° 2' 18.96" E |
Technical Information
Dimensions
total length | 870 m | |
girder depth | 1.200 m | |
standard span lengths | 30 m | |
length of movable section | 34 m |
Materials
deck |
precast prestressed concrete
|
---|---|
piers |
reinforced concrete
|
deck of main span |
steel
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- New Farm RiverWalk Opening Span, Brisbane, Australia. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):
- New Farm RiverWalk Replacement, Brisbane, Queensland. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):
- About this
data sheet - Structure-ID
20071946 - Published on:
21/10/2016 - Last updated on:
09/06/2017