0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

New BioBio River Rail Bridge

General Information

Beginning of works: 2022
Completion: 2025
Status: under construction

Project Type

Location

Location: , , ,
Crosses:
  • Biobío River
Replaces: BioBio River Rail Bridge (1889)
Coordinates: 36° 49' 48.95" S    73° 4' 54.10" W
Show coordinates on a map

Technical Information

Dimensions

width 8.5 m
total length 1 886 m
number of spans 17
piers number 16

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20086729
  • Published on:
    01/09/2023
  • Last updated on:
    01/09/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine