0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 31 December 1889
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Biobío River
Replaced by: New BioBio River Rail Bridge (2025)
Coordinates: 36° 49' 41.63" S    73° 4' 42.32" W
Show coordinates on a map

Technical Information

Dimensions

total length 1 886 m
number of tracks 1

Materials

piers steel
deck truss steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20086727
  • Published on:
    01/09/2023
  • Last updated on:
    03/05/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine