0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: August 1989
Completion: 14 May 1990
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Ness River
Replaces: Ness Viaduct (1862)
Coordinates: 57° 29' 3.79" N    4° 13' 53.53" W
Show coordinates on a map

Technical Information

Dimensions

total length 130 m
span lengths 38 m - 52 m - 38 m
number of spans 3
number of tracks 1

Cost

cost of construction Pound sterling 3 400 000

Materials

piers reinforced concrete
deck slab reinforced concrete
abutments masonry
main girders steel

Participants

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20015968
  • Published on:
    06/04/2005
  • Last updated on:
    10/04/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine