0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Naples-Bari High-Speed/High-Capacity Rail Line

General Information

Beginning of works: 2015
Completion: 2027
Status: under construction

Project Type

Function / usage: High-speed rail line
Certification(s):

Location

km Name
Show coordinates on a map

Technical Information

Dimensions

total length 145 km
number of tracks 2
maximum speed 250 km/h
track gauge 1 435 mm
second section Orsara-Bovino
length 11.8 km
Section Apice-Hirpinia
length 18.7 km
Section Hirpinia-Orsara
length 28 km

Participants

Section Apice-Hirpinia
Contractor
Section Hirpinia-Orsara
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20088970
  • Published on:
    08/07/2024
  • Last updated on:
    08/07/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine