0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Galleria Hirpinia
Beginning of works: 2024
Status: under construction

Project Type

Function / usage: High-speed rail tunnel
Structure: Tunnel
Construction method: Tunnel boring machine (TBM)

Location

Location: , , ,
, , ,
, , ,
, , ,
, , ,
, , ,
Part of:
Coordinates: 41° 5' 9.97" N    15° 5' 2.97" E
Coordinates: 41° 14' 25.12" N    15° 16' 51.68" E
Show coordinates on a map

Technical Information

Dimensions

length 27 000 m
number of tracks 2
maximum speed 250 km/h
track gauge 1 435 mm

Participants

Contractor

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20088971
  • Published on:
    08/07/2024
  • Last updated on:
    07/12/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine