0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Nanterre Elevated Motorway Bridge (A14)

General Information

Beginning of works: 1994
Completion: 1996
Status: in use

Project Type

Location

Location: , , ,
Part of:
Connects to: Carrières Viaduct (1996)
Coordinates: 48° 54' 14.44" N    2° 11' 49.84" E
Show coordinates on a map

Technical Information

Dimensions

total length ca. 250 m
span lengths 7 x ca. 35 m
deck deck depth 1.50 m

Materials

deck concrete
piers steel

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20005279
  • Published on:
    22/09/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine