0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1960
Completion: 1968
Status: in use

Project Type

Location

Location: ,
Coordinates: 34° 30' 6" N    132° 53' 33" E
Show coordinates on a map

Technical Information

Dimensions

height 39.5 m
retained water volume 7 540 000 m³
crest length 213.4 m
dam volume 69 000 m³
water surface area 730 000 m²

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20069373
  • Published on:
    17/01/2016
  • Last updated on:
    22/12/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine