General Information
Completion: | 2003 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Railroad (railway) bridge |
---|---|
Structure: |
Rigid frame bridge |
Location
Location: |
Motilla del Palancar, Cuenca, Castile-La Mancha, Spain |
---|---|
Coordinates: | 39° 35' 36.01" N 1° 57' 28.99" W |
Technical Information
Dimensions
width | 14.0 m | |
total length | 146 m |
Quantities
columns | concrete volume | 365 m³ |
reinforcing steel | 73 t | |
deck | concrete volume | 2 403 m³ |
prestressing steel | 30 t | |
reinforcing steel | 200 t | |
foundations | concrete volume | 2 721 m³ |
reinforcing steel | 148 t | |
walls | concrete volume | 1 527 m³ |
reinforcing steel | 97 t |
Cost
cost of construction | Euro 1 641 617 |
Participants
Owner
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Cruces en líneas de alta velocidad mediante pérgolas. Pergolas for high speed rail crossings. In: Hormigón y acero, v. 62, n. 259 (1st Quarter 2011), pp. 91-103. (2011):
- About this
data sheet - Structure-ID
20065847 - Published on:
07/01/2014 - Last updated on:
05/02/2016