General Information
Completion: | 1972 |
---|---|
Status: | in use |
Project Type
Structure: |
Haunched girder bridge |
---|---|
Material: |
Prestressed concrete bridge |
Function / usage: |
Road bridge |
Structure: |
Box girder bridge |
Construction method: |
Balanced cantilever method |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Molins de Rei, Barcelona, Catalonia, Spain |
---|---|
Coordinates: | 41° 24' 29.59" N 2° 0' 41.51" E |
Technical Information
Dimensions
span lengths | 62.50 m - 125.0 m - 62.50 m | |
number of spans | 3 | |
deck | deck depth | 2.50 - 6.00 m |
deck width | 2 x 14.90 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Los puentes del Andarax y Molins del Rey. In: Hormigón y acero, v. 24, n. 107-108 (2nd Quarter 1973), pp. 209-218. (1973):
- About this
data sheet - Structure-ID
20075146 - Published on:
26/04/2018 - Last updated on:
03/05/2018