General Information
Project Type
Structure: |
Half-through arch bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Cantilever construction using temporary cable-stays |
Location
Technical Information
Dimensions
total length | 1 330 m | |
main bridge | ||
---|---|---|
total length | 650 m | |
span lengths | 100 m - 450 m - 100 m | |
number of spans | 3 |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Design and Construction of a Double-leg Rib Arch Bridge. Presented at: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011. (2011):
- About this
data sheet - Structure-ID
20062219 - Published on:
20/10/2011 - Last updated on:
05/02/2016