0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Design and Construction of a Double-leg Rib Arch Bridge

Author(s):


Medium: conference paper
Language(s): English
Conference: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011
Published in:
Year: 2011
Abstract:

The technical standard, the general arrangement and the design of the bridge are introduced briefly. Then the construction technology of the bridge is illustrated. Trestleworks are used for transporting and lifting of the segments in side-span area and the steel part of arch seat. A large-span cable crane with its hoisting capability 400t, combined with the cable-stayed cantilever assembly system, is adopted for erection of the mid-span segments. The design and erection of the cable crane, hoisting and matching of the rib, synchronous installation of the upper rib and the lower rib, closure of the rib, and installation of the girder are presented in the paper.

The innovative cable crane brings great convenient and economic benefits; The Flexible connection technology guarantees the relative lineshape and inner force of the double-leg arch ribs; Suitable method of closure is helpful to the realization of the reasonable as-built state of the bridge.

Keywords:
design arch bridge construction cable crane cable-stayed double-leg rib

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10065466
  • Published on:
    03/10/2011
  • Last updated on:
    05/07/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine