General Information
Status: | under construction |
---|
Project Type
Structure: |
Three-span cable-stayed bridge |
---|---|
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Material: |
Steel bridge |
Structure: |
Cable-stayed bridge with semi-fan system |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Function / usage: |
upper deck: High-speed rail bridge lower deck: Railroad (railway) bridge |
Location
Technical Information
Dimensions
total length | 877.5 m | |
span lengths | 62.50 m - 125.00 m - 425.00 m - 175.00 m - 75.00 m | |
number of spans | 5 | |
deck truss | width | 17 m |
height | 14 m | |
lower deck | number of tracks | 2 |
upper deck | number of tracks | 2 |
Materials
deck truss |
steel
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- The Overall Design and Application of M280 Cable System of the Mingyuexia Yangtze River Bridge of Chongqing Donghuan Railway. Presented at: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, pp. 2083-2084. (2022):
- About this
data sheet - Structure-ID
20085382 - Published on:
16/02/2023 - Last updated on:
16/02/2023