0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The Overall Design and Application of M280 Cable System of the Mingyuexia Yangtze River Bridge of Chongqing Donghuan Railway

The Overall Design and Application of M280 Cable System of the Mingyuexia Yangtze River Bridge of Chongqing Donghuan Railway
Author(s): , ,
Presented at IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, published in , pp. 2083-2084
DOI: 10.2749/nanjing.2022.2083
This publication is not currently available in full text.
Download preview file (PDF) 0.28 MB

Mingyuexia Yangtze River Bridge is a (62.5+125+425+175+75) m double-deck four-line railway steel truss girder cable-stayed bridge with high and low towers. In view of characteristics of the bridge ...
Read more

Bibliographic Details

Author(s): (China Railway Eryuan Engineering Group Co. Ltd, Chengdu 610036, China)
(China Railway Eryuan Engineering Group Co. Ltd, Chengdu 610036, China)
(China Railway Eryuan Engineering Group Co. Ltd, Chengdu 610036, China)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Published in:
Page(s): 2083-2084 Total no. of pages: 2
Page(s): 2083-2084
Total no. of pages: 2
DOI: 10.2749/nanjing.2022.2083
Abstract:

Mingyuexia Yangtze River Bridge is a (62.5+125+425+175+75) m double-deck four-line railway steel truss girder cable-stayed bridge with high and low towers. In view of characteristics of the bridge heavy design load and prominent fatigue problems, the pressure area adopts steel-concrete combination with closed box chamber structure between the lower beam. Steel truss beam adopts regional and different internal force types of fatigue loading coefficient to improve the economy. The cable adopts the 280MPa high fatigue stress amplitude cable system to extend cable change cycle. Fatigue and safety durability of the cables are comprehensively improved by a variety of means, including improvement of the stress of cable base metal, reduction of bending stress of the transition section, improvement of clip structure, more than 70% of life span is increased compared with the M250 cable.

Keywords:
cable-stayed bridge Steel truss girder double-deck four-line railway fatigue loading coefficient M280 cable

Structures and Projects

Geographic Locations