General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
main span: Through truss bridge main span: Subdivided Warren truss bridge |
Material: |
main span: Steel bridge |
Structure: |
secondary span: Multiple girder bridge |
Material: |
secondary span: Steel-reinforced concrete composite bridge |
Location
Location: |
Fos-sur-Mer, Bouches-du-Rhône (13), Provence-Alpes-Côte d'Azur, France |
---|---|
Coordinates: | 43° 26' 2.47" N 4° 55' 18.71" E |
Technical Information
Dimensions
main span | 101 m | |
span lengths | 54 m - 101 m | |
number of spans | 2 |
Quantities
secondary span | structural steel | 120 t |
truss | structural steel | 520 t |
Materials
truss |
steel
|
---|---|
abutments |
reinforced concrete
|
pier |
reinforced concrete
|
secondary span |
composite steel-reinforced concrete
|