0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): ESPRIT arena; LTU Arena; Rheinarena; Multifunktionsarena Düsseldorf; Düsseldorf Arena
Beginning of works: 2002
Completion: 30 November 2004
Status: in use

Project Type

Location

Location: , , ,
Part of:
Next to: Arena/Messe-Nord Station (2004)
Beckbuschstrasse Overpass
Replaces: Rheinstadion (1975)
Coordinates: 51° 15' 42" N    6° 43' 59" E
Show coordinates on a map

Technical Information

Dimensions

width 200 m
length 240 m
office space 7 000 m²
seats 51 500
gate width 14 m
height 16 m

Cost

cost of construction Euro 218 000 000

Materials

roof truss steel
building structure reinforced concrete

Chronology

22 November 2001

City council decides on the construction of a multi-purpose stadium. It will replace the existing Rheinstadion.

31 May 2002

The city and the investors sign a contract over the construction of the new arena to replace the Rhine Stadium for 218 million Euros.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20002925
  • Published on:
    09/02/2002
  • Last updated on:
    13/09/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine